VisualAnalysis Introduction
VisualAnalysis uses the following workflow. More information on how to get started can be found in the Training Videos.
-
Model
- Sketch members in the Model View by clicking and dragging the mouse on the Grid. Nodes are automatically created at the member's ends.
- Adjust the parameters of the grid or add new grids of various types in the tab.
- Select items graphically with a mouse-click to edit them in the tab.
- Click on the white-space in the Model View to Select "nothing" and modify the Project Settings.
- Use the right-click context-menu for quick relevant commands pertaining to the view (Model View, Result View, Design View) and the items that are currently selected.
- Use the tab in each view to show or hide information graphically.
- Select nodes in the Model View to define the support conditions.
-
Load
- Choose a Service Load Case, such as D (Dead Loads), L (Live Loads), etc.
- Select one or more nodes or members, then Apply Nodal Load or Apply Member Load using the buttons in the Loading Ribbon.
- Use the Load Case Manager to select load cases from standard building codes or to create custom load combinations.
-
Analyze
- The finite element analysis is automatically performed (i.e. there is no button to click).
- The analysis results (displacements, forces, moments, and stresses) are displayed in the Results View.
- Adjust the setting in the tab to modify what is shown graphically in the Results View.
-
Design
- Manually add the members to Design Groups or allow VisualAnalysis to Auto-Group Members using the feature in the Modify tab.
- The design is performed automatically and the maximum unity value (demand to capacity ratio) is graphically displayed for each member in the Design View.
- Manually adjust the parameters of the members or use the Design The Group to search for the optimal member section.
-
Report
- Create reports in the Report View by double-clicking or dragging and dropping from the available tables in the tab.
- Adjust the Report Setting and Model Filters in the Modify tab or rearrange or delete the tables in the report.
- Click on tables in the report to select them and adjust the parameters in the tab.
See Also