Both Project Reports and Report Styles can be created and saved in VisualAnalysis. While Project Reports are saved in the .vap project file, Report Styles are saved in the Customized Data Folder and can be used for multiple Projects. VisualAnalysis also includes a few default IES Report Styles.
After creating a report, go to the
tab, name the report, and click the Save in Project button. This saves the Project Report in .vap project file for easy access.To delete a Project Report, click the X next to the report in the
tab. The command can be used to restore a deleted report.After creating a report, go to the Customized Data Folder in an XML file and makes the style available for use in other VisualAnalysis projects.
tab, name the report, and click the Save as Style button. This saves the Report Style in theTo create a Report from Report Style, Simple double-click on the saved report in the tab or drag the saved report onto the Report View.
To update a Report Style, create a report based on the style, modify the report as need, and save the style using the original name.
To delete a style, click the X next to the style in the Customized Data Folder in an XML file. The only way to restore a style once it is deleted is to import a backup copy of the style file.
tab or manually delete the style in theReport Styles can be shared by copying the XML style file (found in
) to the same location on another computer. The XML file can be manually edited to merge styles from other users. Always save a back up copy of the XML file before doing any manual customization so the file can be restored if it gets corrupted.